FIRE HARDENING
FIRE HARDENING & MITIGATION
- Installed over 2500 high fire (fire-wrapped, composite, etc.) poles in desert, rocky and mountainous terrains.
- Installed over 450 miles of covered conductor.
- Installed over 300 automated (RCS and RSR) switches.
- Installed branch line fusing on over 250 miles of power lines.
FIRE HARDENING MITIGATION
- Installed over 2500 high fire (fire wrapped, composite, etc.) poles in desert and rocky, mountainous terrains
- Installed over 250 miles of covered conductor
- Installed over 100 automated (RCS and RSR) switches
- Installed branch line fusing on over 150 miles of power lines.
Support utility PSPS programs including line inspections
Mitigated over 5000 notifications/ inspection findings
Significant experience working in environmentally sensitive areas and dealing with related government agencies (Forestry, BLM, Bureau of Indian Affairs, etc.)
Latest News
News & Update
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras in eleifend augue. Pellentesque dapibus odio non fermentum vestibulum. Nunc nec fringilla dolor.
Most Modern Businesses &…
Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley
Repair Damaged Or Loose…
Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley
Protection By Surge Protectors
Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley