- Installed over 2500 high fire (fire wrapped, composite, etc.) poles in desert and rocky, mountainous terrains
- Installed over 250 miles of covered conductor
- Installed over 100 automated (RCS and RSR) switches
- Installed branch line fusing on over 150 miles of power lines